Betekenis van:
main yard

main yard
Zelfstandig naamwoord
    • yard for a square mainsail

    Hyperoniemen


    Voorbeeldzinnen

    1. High absenteeism and a lack of qualified workers are currently the main problems facing the yard;
    2. First, the September plan, compared to the June draft plan, assumes significantly higher sales prices for car carriers, one of the two main products of the new yard.
    3. The Commission considered that the main doubts concerned ship 6079, which is the third sister ship to 6077, built at the same yard, Marghera, with planned delivery in October 2005.
    4. The shipyard also plans to increase the wages of workers directly involved in production by 10 % in 2006 and by 4 % p.a. from 2008 to 2010. High absenteeism and a lack of qualified workers are currently the main problems facing the yard;
    5. First, the September plan, compared to the June draft plan, assumes significantly higher sales prices for car carriers, one of the two main products of the new yard. The plan bases the projections for the first few years on existing contracts concluded by Gdynia Shipyard.
    6. The Commission considered that the main doubts concerned ship 6079, which is the third sister ship to 6077, built at the same yard, Marghera, with planned delivery in October 2005. The delivery of this ship was postponed in relation to the December 2000 production plan owing to the decision to build ship 6077 at Marghera.
    7. In the justification for its decision sent to the Treasury, Amber cited as the main reason for its withdrawal the fact that, after an in-depth due diligence examination of the shipyard’s situation, it had concluded that the yard would not become profitable even after restructuring measures, including significant investments, had been implemented.
    8. The Commission considered that the main doubts concerned ship 6079, which is the third sister ship to 6077, built at the same yard, Marghera, with planned delivery in October 2005. The delivery of this ship was postponed in relation to the December 2000 production plan owing to the decision to build ship 6077 at Marghera. These doubts are also based on indications (letter of intent signed before the final contracts were signed in December 2000) that the current production sequence, with a very late delivery for ship 6079, was originally intended.